ALUMINIUM MESSE Blog

Fact Sheets - PDF

French Version Download 190 kb
Dutch Version Download 188 kb
Spanish Version Download 189 kb
Norwegian Version Download 189 kb
Polnish Version Download 207 kb
Turkish Version Download 203 kb
Chinese Version   Download 284 kb
 Download 214 kb

SWF version exceeds your flash player version

Reed Fair Venture Capital

Reed Fair Venture Capital

Just a drop

Just a drop

Information for Stand Construction

Your Check List

Check list for contact persons and deadlines [PDF | 99 KB]

To view the Document, you will need the Acrobat Reader, which you can download here for free.

Construction and dismantling time

Stand construction
Beginning: Friday, September 19, 2008, 8.00 am. The stand construction must be completed by Monday, September 22, 2008, 5.00pm so that proper cleaning is possible before inauguration.

Stand disassembly
At the completion of the exhibition, it is recommended to remove valuable, sensitive and slightly mobile exhibits from the stand. The general disassembly begins an hour after exhibition end and must be concluded by September 27, 2008, 6.00 pm.

Maximum construction height?

All stands with a construction height exceeding 2.50 m are subject to approval. Maximum construction height for the halls 1 - 7 as well as Galeria is 6,00 m (for some areas in Hall 6 and 7 4,50 m). Boundary zone: Stands immediately bordering on a neighbouring stand and exceeding a construction height of 2.50 m are required to observe a distance of 3.00m from their own stand boundary line. This requirement can be waived if a written permission from the holder of the neighbouring stand is presented. Here you find the floor plans on which you can find your stand neighbours.

Suspensions and supply channels

Please contact Mr Oppallach of Messe Essen at klaus.oppallach@messe-essen.de to get technical plans of your stand, where the suspension points as well as supply channels are indicated.

Is a two-storey construction allowed for my stand?

A two-storey construction is only permitted for stands with at least 100 sqm area. The second storey may only cover 50% of the total space. Click here for more information in our Special Conditions.

Extra passes during the construction and dismantling days

No extra passes are necessary during the construction and dismantling days.

Coordination of traffic

Delivery for Hall 3 as well as western parts of Halls 1 and 2 and Galeria via gate 1 (Tor 1).
Delivery for Hall 4, 5 and 6 as well as eastern parts of Halls 1 and 2 via gate 4.
Delivery for Hall 7 via gate 2 (Tor 2).
Please find further detailed information in the following form.

Coordination of traffic [Pdf | 324 kb]

To view the Document, you will need the Acrobat Reader, which you can download here for free.

Further Information

You will find further information as well as order forms in our online service center.